Introduction

A low-lying country like the Netherlands has to cope with numerous problems in its water management. With half of the country below sea level, flooding is always imminent (Meerburg and Van der Werf 2008). If climate changes, the challenges faced by both water managers and land users will only increase (Middelkoop et al. 2001; Van Koningsveld et al. 2008). Besides flooding risks, another important problem is surface water pollution. The European Water Framework Directive (EWFD, 2000/60/EC) obliges all EU member states to ensure that the quality of surface and ground waters reaches a high standard (‘good ecological status’) by the year 2015. This is important, as during the past decades, the main rivers forming the Dutch delta (Rhine, Waal, Scheldt, Meuse and IJssel) gradually became polluted with nutrients (Wendland et al. 2005) and industrial waste (Kooistra et al. 2001; Van Vliet and Zwolsman 2008). Agricultural practices have contributed to these problems: flood risks were increased by rapid water drainage, and excess in nutrients from fertilizers and manure polluted ground and surface water (Oenema et al. 1998; Huijser et al. 2004).

To find solutions for these problems a pilot study was started in 2006 at the Lankheet Estate near the village of Haaksbergen, Overijssel Province, the Netherlands (52°07′49.20″N, 6°42′59.73″E). In this pilot project innovative approaches in land use are tested for their efficiency and feasibility for water management. The project aims to create a constructed wetland that combines different functions in order to show the benefits of such a multifunctional system. Combining functions is an important precondition when solving water problems (Van Koningsveld et al. 2008) and moreover, constructed wetlands might offer land owners (e.g., farmers) new opportunities to generate an income (Meerburg et al. 2009). At Lankheet, four functions are combined: surface water sanitation, periodic water retention in case of floods, biomass production for green energy, and nature conservation. It is investigated whether these functions can be combined ecologically and economically. In this article, we will focus on the results of surface water sanitation and production of biomass.

The constructed wetland was planted with reed (Phragmites australis). This crop can maintain its productivity under various water regimes allowing for temporary water storage and conservation. Nutrients that are taken up by the crop, are removed from the water when the reed is harvested annually (Verhoeven and Meuleman 1999; Toet et al. 2005). At the Lankheet estate, possibilities to use the biomass as source for green energy are further investigated. The pilot study also includes an assessment of the hydrological consequences of the constructed wetland (Querner and Mulder 2007) and the possible development of marsh forests (not presented in this paper).

Materials and methods

Description of the study area

Lankheet is an estate of about 500 hectares on sandy soils with both forests and farmland. The oldest relicts of irrigation systems at this estate date from the thirteenth and fourteenth centuries. Three irrigation meadows were constructed at the estate at the end of the nineteenth century. During the winter, nutrient rich brook water was used to irrigate the meadows to increase soil fertility. This old method was frequently applied in the higher regions of the Netherlands. It increased grass production, allowing three harvests per year. Moreover, the grass sod was kept frost free during the winter, resulting in an early start of the growing season in the spring. A side-effect was that hazardous insects and moles were dispelled. However, the introduction of artificial fertilizers made these meadows obsolete.

The estate is located along a brook (called ‘Buurserbeek’) that has total length of 16.2 km. This brook was used for transportation of goods (mainly wood) until about 1850. Since that time, the main function of the brook has been water drainage, while at the end of the nineteenth and the early twentieth century it was also used for the irrigation purposes that were mentioned before. Similar to other brooks and many waterways in the Netherlands the Buurserbeek is currently eutrophied by run-off and leaching of nutrients from heavily fertilized farmlands upstream and from wastewater. Moreover, the brook has been canalized and its drainage is so powerful that it is causing desiccation in the surrounding areas. The water board in the region (Waterschap Rijn and IJssel) claims that for Dutch conditions water quality in the brook is average, and N (nitrogen), Zn (zinc), Cu (copper) exceed critical regional or national standards (Anonymous 2007).

Experimental site

The estate owners and the local water board agreed to extract water from the brook in 2005 and lead it to a field planted with reed. A water supply canal was especially excavated for this purpose.

A 5 ha field was transformed into six experimental reed filters (Fig. 1) surrounded by dikes. The six filters I–VI (ca. 0.5 ha each) have been planted with reed rhizomes in August 2005 (4/m2; each 20–30 cm long). The inflow into the reed filters varied between 230 and 650 m3 day−1.

Fig. 1
figure 1

Structure of the six reed filters. Each filter (I to VI) consists of three sections (ac). Circles represent flow meters, either input or output. Stars represent proportionate samplers

The nutrient load in the water supply canal is constantly monitored by a sampling point. Moreover, the inflow of eutrophic brook water across the six reed filters is controlled by pumps, flow meters and samplers. The outflow is led through a network of water courses to restore the water table and ecology of the surrounding desiccated forests with “purified water”. Each reed filter consists of three sections (a, b, and c, see Fig. 1), which are separated from each other by dikes.

For each reed filter, the water intake volume and water output are measured by flow meters and registered by a central computer. For every 100 m3 of water through flow a signal is given to the discharge-proportional sampler, which takes a sample of about 80 ml and stores it in a cooled bottle.

To assess the sanitation effect of the reed filters the brook water is sampled before the intake points and beyond the outlet. Every 24 h such a bottle is filled. After a week, output samples are mixed separately for every of the six reed filter. Input samples are only taken by two proportional samplers at filters II and IV and also mixed separately at the end of the week. Samples are analyzed for total amounts of phosphorous (TP) and nitrogen (TN), nitrate (N–NO3) and orthophosphate (ortho-P) with a spectrophotometer after chemical dilation in prefilled test tubes (Hach Lange, Tiel, The Netherlands).

After initial testing in 2006 and in early 2007, the study started late May 2007 and lasted seven consecutive weeks until late July. The difference between the chemical composition of the water at the input and the output was calculated in order to estimate nutrient removal and storage (kg ha−1 week−1) by the reed filters. Also the efficiency (% removal) was estimated.

Testing procedures

Two different treatments were compared in order to find out how the best sanitation efficiency could be reached. During the first treatment, treatment A, the locks in the dikes between the sections in the reed filter were all open and the water that was pumped into a reed filter was allowed to stay in sections a, b and c for 24 h. This treatment was applied on reed filters I, III and V. During the second treatment, treatment B, the locks in the dikes between sections a, b and c of the reed filter were closed and the water was pumped from section to section after it had been in the previous section for 6 h. This treatment was applied on reed filters II, IV and VI. So, residence time per unit area was 24 h in treatment A and 6 h per unit area in treatment B. Consequently, there was water in all three sections simultaneously in reed filters under treatment A and only in one section per time period in those filters under treatment B. The reader should thus be aware that the size of the unit area and the volume of water differed between treatments.

For each treatment, the average concentration of the inlet was compared with the average concentration of the outlet using a two-sided unpaired t test. This comparison was made for TP (total phosphorus), TN (total nitrogen), N–NO3 (nitrate), and ortho-P (orthophosphate).

Biomass was sampled at 72 locations in the first year after construction, September 2006, in order to determine the dry weight (g m−2). In 2007 the biomass production of the six reed filters was measured five times via destructive harvesting and indirectly by using the CropScan® multispectral radiometer. The indirect method by the Crop Scan was applied in order to assess the variance in standing crop within and between sections more accurately. The CropScan measures the reflectance from the plants in specific bandwidths, which are used to calculate the Weighted Difference Vegetation Index (WDVI) as follows: WDVI = IR − (IRs / GRs) × GR(%), where IR and GR are the infrared and green reflectance of the crop and IRs and GRs are the infrared and the green reflectance of the bare soil (Uenk et al. 1992). The WDVI-measurements were used to estimate above ground biomass.

During the initial four biomass measurements two reed sections of each reed filter were sampled (see Table 2). During the fifth biomass measurement in September 2007 all three sections of each reed filter were sampled (three samples/section). The samples were dried and the dry weight (g m−2) was determined. The reed in filter II was harvested in September 2007, the reed in all other reed filters was allowed to die-back and was harvested in March 2008. Reed filter II was harvested in September in order to analyze re-growth capabilities of the reed and to analyze its nutrient content (data not presented here).

Experimental results

Water quality

Nutrient concentrations in the water supply canal were continuously monitored. The nutrient concentrations at the inlet of the reed filters did not differ between the treatments A and B (data not shown).

With increasing nutrient load (kg ha−1 week−1) removal of nutrients increased linearly (Figs. 2, 3, 4, 5). Except for Ortho-P, removal efficiencies of TN, TP, and N–NO3 were significantly higher in treatment A (Figs. 2, 3, 4, 5; Table 1). The treatments significantly reduced nutrient concentrations from the inflow to the outflow (Table 2). The nutrient removal efficiencies of different reed filters during a 7-week period are presented in Table 1. More water was pumped out of reed filters IV, V, and VI than was pumped into these filters (see also Table 1). The reason for this was the emergence of seepage in these filters. Unfortunately it was impossible to determine the quality of this seepage water, which is probably caused by ground water flows. Water input exceeded that of water output in the other reed filters, presumably caused by evaporation and/or infiltration. However, also in the other filters the emergence of seepage could not be excluded.

Fig. 2
figure 2

Comparison of the removal capacity of nitrogen (N) and the efficiency of both treatments (treatment A: squares, treatment B: circles)

Fig. 3
figure 3

Comparison of the removal capacity of nitrate (N–NO3) and the efficiency of both treatments (treatment A: squares, treatment B: circles)

Fig. 4
figure 4

Comparison of the removal capacity of phosphate (P) and the efficiency of both treatments (treatment A: squares, treatment B: circles)

Fig. 5
figure 5

Comparison of the removal capacity of ortho-phosphate (ortho-P) and the efficiency of both treatments (treatment A: squares, treatment B: circles)

Table 1 Efficiencies of the different reed filters in the removal of nutrients from the water (TP = total phosphorous, TN = total nitrogen)
Table 2 Average concentrations ±SE (n = 38) for in- and outflow of the reed filters

Biomass productivity

Biomass production increases rapidly over the years. On average, standing crop in September 2006 based on reflectance measurements was 221 g m−2. One year later, at the end of September 2007, standing crop increased to an average of 903 g m−2. Clearly, 2 years after transplanting rhizomes, still quite some variation in standing crop occurs (Fig. 6).

Fig. 6
figure 6

Box and Whisker Plot that demonstrates differences in estimated biomass between different reed sections in 2007. Boxes indicate 25th, 50th and 75th percentiles

Discussion

In this study, common reed (Phragmites australis) was used to create a multifunctional system that combines surface water sanitation, water storage and green energy production. The results so far are promising: the soil–reed–microbe system is capable of filtering significant amounts of nutrients from the water and biomass production is considerable.

The current ecological status of Dutch surface waters is constantly monitored in line with the demands of the European Water Framework Directive (EWFD, 2000/60/EC). New targets are to be set to reach the “good status”. In 2009 the EU member states should finish a first policy plan for each international river basin district containing a “programme of measures” to reach the EFWD-goals.

Critical threshold values for TN and TP are not yet defined for the surface water body “Buurserbeek”. This is a task for the province of Overijssel, where the Lankheet estate is located. Preliminary critical threshold values for a good ecological perspective were recently provided: 2.5–4 mg N/l and 0.12–0.14 mg P/l (Anonymous 2008).

Our results demonstrate that the critical value for P is not problematic, while for N this still remains questionable. The residence time (time that the water remains in the filters) seems to be very important for the efficiency of reed sanitation, a conclusion shared by others (Schulz et al. 2003). Table 1 and Figs. 2, 3, 4, 5 show that with increasing residence time sanitation efficiency also increases, especially for TN. In a pilot lasting 1-week residence time was increased to 72 h in three filters. Now efficiencies of 54, 61, 80, and 85% were obtained for TP, Ortho-P, TN, and N–NO3, respectively. Residence time is currently being investigated more in detail. Furthermore, Figs. 2, 3, 4, 5 clearly indicate a non-saturating linear relationship between nutrient load and nutrient removal. This suggests that soil–plant–microbe system is not saturated and is probably capable to deal with higher nitrogen and phosphorous loads. Nitrogen removal in constructed wetlands depend on the combination of factors, such as denitrification, plant uptake and volatilization. Many of these processes are pH dependent (Vymazal 2007).

At Lankheet, the average pH of the reed filter soils was measured in 2006, 2007, and 2008 and the mean results varied between 6.1 and 6.2, whereas the pH of the surface water was around 7.0. But pH is only one soil characteristic. Other soil properties (such as carbon, redox potential, DO (dissolved oxygen) level at the soil water interface) are also important for the efficient removal of nutrients from the water (Sooknah and Wilkie 2004). Among others, these properties will be analyzed the forthcoming years.

The loading rates for TN and TP in this system are considerably lower compared to those of constructed wetlands for wastewater treatment (Vymazal 2007). This is due to the fact that for surface water sanitation high volumes of water with a relatively low concentration of N and P have to be sanitized. However, this means that in order to sanitize surface water large areas next to surface water bodies are required. We have calculated the area that is needed to compensate for the yearly P-load in the Netherlands (7,000 tons P), assuming an efficiency of 50%. About 150,000 ha of constructed wetlands with reed would be needed in the Netherlands in order to meet the EWFD-targets.

Reed is a highly productive crop (Vymazal 2005), with documented annual productivities varying between 10 and 50 t ha−1. Assuming biomass productivity of 25 t ha−1, 150,000 ha (about 5% of the total agricultural land available) could potentially produce a total of 3,750,000 t of reed biomass. This corresponds to an amount of about 64 PJ thermic green energy, under the precondition that this quantity of reed can be used economically and technically. This is a considerable potential and is equivalent to approx. 3% of the total expected energy demand of the Netherlands in 2030. Two years after planting average productivity was around 9 t ha−1, with a high variance (Fig. 6). However, Fig. 6 also shows that 25% of the samples had a higher productivity than 11 t ha−1, with the highest value of approx. 19 t ha−1 2 years after planting. Generally, it takes up to 4 years for P. australis to reach maximum standing crop (Vymazal and Kropfelová 2005), so we may assume that in our case maximum standing crop is by far not reached yet.

Choosing the moment of harvesting may have important consequences for the soil–plant–microbe system, especially on aspects as nutrient-removal, methane emission, filter regeneration and biomass production. Harvesting times need to be optimized in order to combine the different functions as water sanitation, biomass production and biodiversity goals.

In order to remove the maximum amount of nutrients out of the soil–plant–microbe system, harvesting should start before re-translocation of nutrients to the root system occurs (late summer). It is known that this can substantially contribute to the nutrient removal capacity of the wetland (Brix 1994; Kadlec and Knight 1996; Verhoeven and Meuleman 1999). Another advantage is that in this period standing crop is at its optimum (high energy content), the reed is still vital and methane production is limited (Sorrell and Boon 1994; Sorrell et al. 1997; Picek et al. 2007). However, when nutrients are still located in the plant when harvested, high concentrations of nutrients in the biomass may have corrosive effects on the energy processing plant. More importantly, plant re-growth in the next year may be lower (Meuleman et al. 2002). The reed at Lankheet was partly harvested in September 2007, but the major part was harvested in early March 2008. Re-growth rates of reed in the filters that were mown in early March 2008 seemed quicker than the filter that was mown in September 2007 (data not shown). However, maximum biomass productivity was difficult to interpret because of a tremendous hail storm in June 2008. Conversely, mowing in February may also have several disadvantages. It may lead to less biomass production due to loss of foliage (and thus lower energy content) and lower water sanitation efficiencies in the long term.

For maximum biodiversity, mowing should probably take place at the end of February/early March. Mowing in August or in September/October can have an undesirable effect on the biodiversity as birds, insects and small mammals will use reed as cover during winter (Huijser et al. 2001, 2004; Schmidt et al. 2005).

Here, we have demonstrated that constructed wetlands can effectively contribute to the reduction of nutrients in the surface water and that Phragmites australis is capable to produce good amounts of biomass within a few years after the start of the project. The coming years biomass harvest times will be further optimized according to the functions that were mentioned earlier.